United States › Grid › Interconnection queues › Texas
OTHER · ERCOTSherbino II BESS SLF (Placeholder)
Sherbino II BESS SLF (Placeholder) is a 17.0 MW other request withdrawn in the ERCOT interconnection queue, in Pecos County, Texas.
Queue statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandonedMay 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 25INR0674
- Grid region
- ERCOT (Texas)
- Developer
- Phoenix Battery Storage, LLC
- Connection point (POI)
- 38430 TNMP White baker Switching Station 138kV
- Location
- Pecos County, Texas
- Technology
- Other: 17.0 MW
- Total requested
- 17.0 MW
- Study phase
- FIS & SS Incomplete
- Queue status
- Withdrawn
- Proposed online date
- August 2025
- Withdrawn
- May 2024
Location
Marker shows the centre of Pecos County; the queue data does not give exact sites.
Other requests in Pecos County
- Laurel Wind Energy CenterOnshore wind · 307 MW · agreement signed
- Longfellow Solar IISolar + storage · 207 MW · agreement signed
- Pecos Storage CenterWind + storage · 201 MW · agreement signed
- Longfellow Solar ISolar + storage · 178 MW · agreement signed
- Headcamp Energy Storage PlantBattery storage · 153 MW · agreement signed
- Longfellow BESS IISolar + storage · 106 MW · agreement signed
- Sherbino II BESS SLFBattery storage · 77.4 MW · agreement signed
- Longfellow BESS ISolar + storage · 55.0 MW · agreement signed
- Downtown BESSBattery storage · 10.0 MW · agreement signed
- Alamo Street BESSBattery storage · 10.0 MW · agreement signed
- Indian Mesa repowerOnshore wind · 9.3 MW · agreement signed
- Desert Sky repowerOnshore wind · 7.2 MW · agreement signed
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem