Fence Post BESS MW Increase

Fence Post BESS MW Increase is a 20.2 MW other request withdrawn in the ERCOT interconnection queue, in Navarro County, Texas.

Queue statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandonedDec 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
22INR0420
Grid region
ERCOT (Texas)
Developer
Fence Post Solar Project, LLC
Connection point (POI)
tap 138kV 3127 Trinidad – 3483 Goodloe
Location
Navarro County, Texas
Technology
Other: 20.2 MW
Total requested
20.2 MW
Study phase
FIS & SS Incomplete
Queue status
Withdrawn
Proposed online date
December 2022
Withdrawn
December 2020

Location

Marker shows the centre of Navarro County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Navarro County