BATTERY STORAGE · ERCOT

Nightfall BESS SLF

Nightfall BESS SLF is a 11.0 MW battery storage request withdrawn in the ERCOT interconnection queue, in Uvalde County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2024 (completed)
  2. Withdrawn / abandonedJul 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
26INR0168
Grid region
ERCOT (Texas)
Developer
BDPU Solar Nightfall, LLC
Connection point (POI)
Tap 138KV 8707 Dryfrio - 8234 Uvalde
Location
Uvalde County, Texas
Technology
Battery: 11.0 MW
Total requested
11.0 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
8 May 2024
Proposed online date
June 2026
Withdrawn
July 2025

Location

Marker shows the centre of Uvalde County; the queue data does not give exact sites.