SunRay is a 204 MW solar request built and operating in the ERCOT interconnection queue, in Uvalde County, Texas.
Request details
- Queue ID
- 21INR0395
- Grid region
- ERCOT (Texas)
- Developer
- AP Sunray LLC
- Connection point (POI)
- Dry Frio 138 kV station
- Location
- Uvalde County, Texas
- Technology
- Solar: 204 MW
- Total requested
- 204 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 16 July 2019
- Agreement signed
- 6 July 2021
- Proposed online date
- August 2024
- Came online
- August 2024
Location
Marker shows the centre of Uvalde County; the queue data does not give exact sites.
Other requests in Uvalde County
- Nightfall SolarSolar Β· 181 MW Β· agreement signed
- Photo Solar 2Solar + storage Β· 300 MW Β· in study
- Photo BESS 2Solar + storage Β· 150 MW Β· in study
- Photo Solar 1Solar + storage Β· 150 MW Β· in study
- Photo BESS 3Solar + storage Β· 100 MW Β· in study
- Sunsetter BESSBattery storage Β· 100 MW Β· in study
- Photo BESS 1Solar + storage Β· 75.0 MW Β· in study
- Ashra Solar SLFSolar + storage Β· 40.3 MW Β· in study
- Ashra Storage SLFSolar + storage Β· 1.6 MW Β· in study
- Fluorite SolarSolar Β· 25.0 MW Β· suspended
- Basalt SolarSolar Β· 20.0 MW Β· suspended
- Kochab SolarSolar Β· 204 MW Β· withdrawn