SOLAR Β· ERCOTBasalt Solar
Basalt Solar is a 20.0 MW solar request suspended in the ERCOT interconnection queue, in Uvalde County, Texas.
Queue statusPaused / redesign
- PlanningQueued Jul 2017 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- Operating (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 20INR0013
- Grid region
- ERCOT (Texas)
- Location
- Uvalde County, Texas
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Queue status
- Suspended
- Entered queue
- 10 July 2017
Location
Marker shows the centre of Uvalde County; the queue data does not give exact sites.
Other requests in Uvalde County
- Nightfall SolarSolar Β· 181 MW Β· agreement signed
- Photo Solar 2Solar + storage Β· 300 MW Β· in study
- Photo BESS 2Solar + storage Β· 150 MW Β· in study
- Photo Solar 1Solar + storage Β· 150 MW Β· in study
- Photo BESS 3Solar + storage Β· 100 MW Β· in study
- Sunsetter BESSBattery storage Β· 100 MW Β· in study
- Photo BESS 1Solar + storage Β· 75.0 MW Β· in study
- Ashra Solar SLFSolar + storage Β· 40.3 MW Β· in study
- Ashra Storage SLFSolar + storage Β· 1.6 MW Β· in study
- Fluorite SolarSolar Β· 25.0 MW Β· suspended
- SunRaySolar Β· 204 MW Β· built
- Kochab SolarSolar Β· 204 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem