United States › Grid › Interconnection queues › Texas
SOLAR + STORAGE · ERCOTPhoto BESS 1
Photo BESS 1 is a 75.0 MW solar + storage request in interconnection study in the ERCOT interconnection queue, in Uvalde County, Texas.
Queue statusIn planning
- PlanningQueued Oct 2021 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Sep 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 24INR0121
- Grid region
- ERCOT (Texas)
- Developer
- CED Development Inc.
- Connection point (POI)
- 5885 Downie 138kV
- Location
- Uvalde County, Texas
- Technology
- Battery: 75.0 MW · Battery
- Total requested
- 75.0 MW
- Study phase
- SS Completed, FIS Started, No IA
- Queue status
- Active
- Entered queue
- 29 October 2021
- Proposed online date
- September 2027
Location
Marker shows the centre of Uvalde County; the queue data does not give exact sites.
Other requests in Uvalde County
- Nightfall SolarSolar · 181 MW · agreement signed
- Photo Solar 2Solar + storage · 300 MW · in study
- Photo BESS 2Solar + storage · 150 MW · in study
- Photo Solar 1Solar + storage · 150 MW · in study
- Photo BESS 3Solar + storage · 100 MW · in study
- Sunsetter BESSBattery storage · 100 MW · in study
- Ashra Solar SLFSolar + storage · 40.3 MW · in study
- Ashra Storage SLFSolar + storage · 1.6 MW · in study
- Fluorite SolarSolar · 25.0 MW · suspended
- Basalt SolarSolar · 20.0 MW · suspended
- SunRaySolar · 204 MW · built
- Kochab SolarSolar · 204 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem