United States › Grid › Interconnection queues › Texas
SOLAR + STORAGE · ERCOTAshra Solar SLF
Ashra Solar SLF is a 40.3 MW solar + storage request in interconnection study in the ERCOT interconnection queue, in Uvalde County, Texas.
Queue statusIn planning
- PlanningQueued Apr 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jun 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 28INR0188
- Grid region
- ERCOT (Texas)
- Developer
- Ashra Solar, LLC
- Connection point (POI)
- Tap 69kV bus#5823 UVALDE Switch (UVALDESW9) to bus#5820 UVALDE SUB (UVALDESUB9)
- Location
- Uvalde County, Texas
- Technology
- Solar: 40.3 MW · Battery
- Total requested
- 40.3 MW
- Study phase
- SS Completed, FIS Started, No IA
- Queue status
- Active
- Entered queue
- 25 April 2025
- Proposed online date
- June 2028
Location
Marker shows the centre of Uvalde County; the queue data does not give exact sites.
Other requests in Uvalde County
- Nightfall SolarSolar · 181 MW · agreement signed
- Photo Solar 2Solar + storage · 300 MW · in study
- Photo BESS 2Solar + storage · 150 MW · in study
- Photo Solar 1Solar + storage · 150 MW · in study
- Photo BESS 3Solar + storage · 100 MW · in study
- Sunsetter BESSBattery storage · 100 MW · in study
- Photo BESS 1Solar + storage · 75.0 MW · in study
- Ashra Storage SLFSolar + storage · 1.6 MW · in study
- Fluorite SolarSolar · 25.0 MW · suspended
- Basalt SolarSolar · 20.0 MW · suspended
- SunRaySolar · 204 MW · built
- Kochab SolarSolar · 204 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem