United States › Grid › Interconnection queues › Texas
OTHER · ERCOTAlbatross FIS application fee
Albatross FIS application fee is a 10.0 MW other request withdrawn in the ERCOT interconnection queue, in Mclennan County, Texas.
Queue statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 26INR0631
- Grid region
- ERCOT (Texas)
- Developer
- Albatross Solar, LLC
- Connection point (POI)
- From Bus #165 Windsor Switch To Bus #161 McGregor
- Location
- Mclennan County, Texas
- Technology
- Other: 10.0 MW
- Total requested
- 10.0 MW
- Study phase
- FIS & SS Incomplete
- Queue status
- Withdrawn
- Proposed online date
- March 2026
- Withdrawn
- December 2024
Location
Marker shows the centre of Mclennan County; the queue data does not give exact sites.
Other requests in Mclennan County
- Jaguar SolarSolar + storage · 301 MW · agreement signed
- Prairie Hill WindOnshore wind · 297 MW · agreement signed
- Cibeles SolarSolar · 252 MW · agreement signed
- Tokio SolarSolar · 171 MW · agreement signed
- Pepper Solar FarmSolar · 121 MW · agreement signed
- Neutron StorageBattery storage · 105 MW · agreement signed
- Axtell BESSBattery storage · 307 MW · in study
- PowerVault BESSBattery storage · 255 MW · in study
- Finch StorageBattery storage · 201 MW · in study
- Albatross BESS 2Battery storage · 160 MW · in study
- Albatross BESSBattery storage · 50.4 MW · in study
- Graphic Packaging GasGas · 43.4 MW · in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem