United States βΊ Grid βΊ Interconnection queues
SOLAR Β· ERCOTEK Tipton Solar 1
EK Tipton Solar 1 is a 20.0 MW solar request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2019 (completed)
- Withdrawn / abandonedJul 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 21INR0388
- Grid region
- ERCOT (Texas)
- Developer
- EnergieKontor US Texas SP 1 LLC
- Connection point (POI)
- 6673 Musquiz 138kV
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Study phase
- FIS & SS Incomplete
- Queue status
- Withdrawn
- Entered queue
- 8 July 2019
- Proposed online date
- May 2021
- Withdrawn
- July 2019
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem