SOLAR Β· ERCOT

EK Tipton Solar 1

EK Tipton Solar 1 is a 20.0 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2019 (completed)
  2. Withdrawn / abandonedJul 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
21INR0388
Grid region
ERCOT (Texas)
Developer
EnergieKontor US Texas SP 1 LLC
Connection point (POI)
6673 Musquiz 138kV
Technology
Solar: 20.0 MW
Total requested
20.0 MW
Study phase
FIS & SS Incomplete
Queue status
Withdrawn
Entered queue
8 July 2019
Proposed online date
May 2021
Withdrawn
July 2019

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem