BATTERY STORAGE Β· ERCOTNorth McAllen BESS
North McAllen BESS is a 9.9 MW battery storage request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2023 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 24INR0527
- Grid region
- ERCOT (Texas)
- Developer
- SBESS TX 3, LLC
- Connection point (POI)
- Station Name: North McAllen Substation_x000D_ Station Code: N_MCALLN_x000D_ PTI Bus#: 8368_x000D_ Load XFMR Name: 138_12_1_x000D_ Transmission Level Voltage: 138 kV
- Technology
- Battery: 9.9 MW
- Total requested
- 9.9 MW
- Study phase
- No MRD
- Queue status
- Withdrawn
- Entered queue
- 23 January 2023
- Proposed online date
- March 2024
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem