πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues

BATTERY STORAGE Β· ERCOT

North McAllen BESS

North McAllen BESS is a 9.9 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
24INR0527
Grid region
ERCOT (Texas)
Developer
SBESS TX 3, LLC
Connection point (POI)
Station Name: North McAllen Substation_x000D_ Station Code: N_MCALLN_x000D_ PTI Bus#: 8368_x000D_ Load XFMR Name: 138_12_1_x000D_ Transmission Level Voltage: 138 kV
Technology
Battery: 9.9 MW
Total requested
9.9 MW
Study phase
No MRD
Queue status
Withdrawn
Entered queue
23 January 2023
Proposed online date
March 2024

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem