United States β€Ί Grid β€Ί Interconnection queues

BATTERY STORAGE Β· ERCOT

Wieland Substation BESS Unit 1

Wieland Substation BESS Unit 1 is a 9.9 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2025 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
25INR0775
Grid region
ERCOT (Texas)
Developer
Telios Quinlan Energy One, LLC
Connection point (POI)
TSP SUBSTATION NAME: WEILAND SUBSATION_x000D_ TSP SUBSTATION CODE: WIELAND_RC_x000D_ LOAD NAME/LOAD TRANSFORMER NAME: TQE1/WIELD_RC_L_B_x000D_ BUS #PTI NUMBER: 6882_x000D_ VOLTAGE 138KV_x000D_ NODE: 3
Technology
Battery: 9.9 MW
Total requested
9.9 MW
Study phase
No MRD
Queue status
Withdrawn
Entered queue
13 March 2025
Proposed online date
January 2026

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem