SOLAR · ERCOTHornet Solar 2 LLC Cancelled
Hornet Solar 2 LLC Cancelled is a 11.0 MW solar request withdrawn in the ERCOT interconnection queue, in Swisher County, Texas.
Queue statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandonedJun 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 23INR0505
- Grid region
- ERCOT (Texas)
- Developer
- Hornet Solar LLC
- Connection point (POI)
- tap 345kV 23914 Tule Canyon - 23912 Ogallala
- Location
- Swisher County, Texas
- Technology
- Solar: 11.0 MW
- Total requested
- 11.0 MW
- Study phase
- FIS & SS Incomplete
- Queue status
- Withdrawn
- Proposed online date
- December 2023
- Withdrawn
- June 2022
Location
Marker shows the centre of Swisher County; the queue data does not give exact sites.
Other requests in Swisher County
- Hornet Solar II SLFSolar + storage · 209 MW · agreement signed
- Commodus 2 WindOnshore wind · 642 MW · in study
- Frye StorageSolar + storage · 504 MW · in study
- Commodus 2 SolarSolar · 502 MW · in study
- Stem SolarSolar · 200 MW · in study
- Solar project GEN-2023-120, Swisher CountySolar · 130 MW · in study
- Hornet SolarSolar · 602 MW · built
- Frye SolarSolar + storage · 502 MW · built
- Comanche Run WindOnshore wind · 500 MW · withdrawn
- Battery storage project GEN-2019-064, Swisher CountyBattery storage · 400 MW · withdrawn
- Wildrose WindOnshore wind · 303 MW · withdrawn
- Lazarus SolarSolar · 300 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem