SOLAR · ERCOT

Hornet Solar 2 LLC Cancelled

Hornet Solar 2 LLC Cancelled is a 11.0 MW solar request withdrawn in the ERCOT interconnection queue, in Swisher County, Texas.

Queue statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandonedJun 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
23INR0505
Grid region
ERCOT (Texas)
Developer
Hornet Solar LLC
Connection point (POI)
tap 345kV 23914 Tule Canyon - 23912 Ogallala
Location
Swisher County, Texas
Technology
Solar: 11.0 MW
Total requested
11.0 MW
Study phase
FIS & SS Incomplete
Queue status
Withdrawn
Proposed online date
December 2023
Withdrawn
June 2022

Location

Marker shows the centre of Swisher County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Swisher County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem