Wildrose Wind

Wildrose Wind is a 303 MW onshore wind request withdrawn in the ERCOT interconnection queue, in Swisher County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2011 (completed)
  2. Withdrawn / abandonedSep 2021 (project stopped here)
  3. ConsentedSep 2015 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
13INR0038
Grid region
ERCOT (Texas)
Developer
S Power
Connection point (POI)
79501 Ogallala 345kV
Location
Swisher County, Texas
Technology
Wind: 303 MW
Total requested
303 MW
Study phase
IA and FIS Pending
Queue status
Withdrawn
Entered queue
30 April 2011
Agreement signed
6 September 2015
Proposed online date
December 2021
Withdrawn
September 2021

Location

Marker shows the centre of Swisher County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Swisher County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem