United States › Grid › Interconnection queues › Texas
SOLAR + STORAGE · ERCOTFrye Storage
Frye Storage is a 504 MW solar + storage request in interconnection study in the ERCOT interconnection queue, in Swisher County, Texas.
Queue statusIn planning
- PlanningQueued Sep 2020 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 22INR0402
- Grid region
- ERCOT (Texas)
- Developer
- Hecate Energy Frye Storage LLC
- Connection point (POI)
- new 345kV sub Kress connecting both 23912 Ogallala - 23914 Tule Canyon circuits
- Location
- Swisher County, Texas
- Technology
- Battery: 504 MW · Battery
- Total requested
- 504 MW
- Study phase
- SS Completed, FIS Started, No IA
- Queue status
- Active
- Entered queue
- 2 September 2020
- Proposed online date
- December 2026
Location
Marker shows the centre of Swisher County; the queue data does not give exact sites.
Other requests in Swisher County
- Hornet Solar II SLFSolar + storage · 209 MW · agreement signed
- Commodus 2 WindOnshore wind · 642 MW · in study
- Commodus 2 SolarSolar · 502 MW · in study
- Stem SolarSolar · 200 MW · in study
- Solar project GEN-2023-120, Swisher CountySolar · 130 MW · in study
- Hornet SolarSolar · 602 MW · built
- Frye SolarSolar + storage · 502 MW · built
- Comanche Run WindOnshore wind · 500 MW · withdrawn
- Battery storage project GEN-2019-064, Swisher CountyBattery storage · 400 MW · withdrawn
- Wildrose WindOnshore wind · 303 MW · withdrawn
- Lazarus SolarSolar · 300 MW · withdrawn
- Onshore wind project GEN-2015-032, Swisher CountyOnshore wind · 300 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem