πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Lazarus Solar

Lazarus Solar is a 300 MW solar request withdrawn in the ERCOT interconnection queue, in Swisher County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2019 (completed)
  2. Withdrawn / abandonedJan 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
21INR0435
Grid region
ERCOT (Texas)
Developer
Lendlease Energy Development
Connection point (POI)
tap 345kV 79501 Ogallala - 79503 Tule Canyon
Location
Swisher County, Texas
Technology
Solar: 300 MW
Total requested
300 MW
Study phase
FIS & SS Incomplete
Queue status
Withdrawn
Entered queue
4 December 2019
Proposed online date
May 2022
Withdrawn
January 2020

Location

Marker shows the centre of Swisher County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Swisher County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem