United States › Grid › Interconnection queues › Texas
SOLAR · SPPSolar project GEN-2023-120, Swisher County
Solar project GEN-2023-120, Swisher County is a 130 MW solar request in interconnection study in the SPP interconnection queue, in Swisher County, Texas, connecting to SPS.
Queue statusIn planning
- PlanningQueued Oct 2023 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2030 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- GEN-2023-120
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SPS
- Connection point (POI)
- Kress 115 kV Substation
- Location
- Swisher County, Texas
- Technology
- Solar: 130 MW
- Total requested
- 130 MW
- Service type
- Energy only (ERIS)
- Study phase
- FACILITY STUDY STAGE
- Queue status
- Active
- Entered queue
- 2 October 2023
- Proposed online date
- December 2030
Location
Marker shows the centre of Swisher County; the queue data does not give exact sites.
Other requests in Swisher County
- Hornet Solar II SLFSolar + storage · 209 MW · agreement signed
- Commodus 2 WindOnshore wind · 642 MW · in study
- Frye StorageSolar + storage · 504 MW · in study
- Commodus 2 SolarSolar · 502 MW · in study
- Stem SolarSolar · 200 MW · in study
- Hornet SolarSolar · 602 MW · built
- Frye SolarSolar + storage · 502 MW · built
- Comanche Run WindOnshore wind · 500 MW · withdrawn
- Battery storage project GEN-2019-064, Swisher CountyBattery storage · 400 MW · withdrawn
- Wildrose WindOnshore wind · 303 MW · withdrawn
- Lazarus SolarSolar · 300 MW · withdrawn
- Onshore wind project GEN-2015-032, Swisher CountyOnshore wind · 300 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem