United States βΊ Grid βΊ Interconnection queues βΊ Texas
BATTERY STORAGE Β· SPPBattery storage project GEN-2019-064, Swisher County
Battery storage project GEN-2019-064, Swisher County is a 400 MW battery storage request withdrawn in the SPP interconnection queue, in Swisher County, Texas, connecting to SPS.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2019 (completed)
- Withdrawn / abandonedMay 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2019-064
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SPS
- Connection point (POI)
- Kress 115kV
- Location
- Swisher County, Texas
- Technology
- Battery: 400 MW
- Total requested
- 400 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 23 May 2019
- Proposed online date
- June 2024
- Withdrawn
- May 2022
Location
Marker shows the centre of Swisher County; the queue data does not give exact sites.
Other requests in Swisher County
- Hornet Solar II SLFSolar + storage Β· 209 MW Β· agreement signed
- Commodus 2 WindOnshore wind Β· 642 MW Β· in study
- Frye StorageSolar + storage Β· 504 MW Β· in study
- Commodus 2 SolarSolar Β· 502 MW Β· in study
- Stem SolarSolar Β· 200 MW Β· in study
- Solar project GEN-2023-120, Swisher CountySolar Β· 130 MW Β· in study
- Hornet SolarSolar Β· 602 MW Β· built
- Frye SolarSolar + storage Β· 502 MW Β· built
- Comanche Run WindOnshore wind Β· 500 MW Β· withdrawn
- Wildrose WindOnshore wind Β· 303 MW Β· withdrawn
- Lazarus SolarSolar Β· 300 MW Β· withdrawn
- Onshore wind project GEN-2015-032, Swisher CountyOnshore wind Β· 300 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem