ONSHORE WIND · ERCOTCommodus 2 Wind
Commodus 2 Wind is a 642 MW onshore wind request in interconnection study in the ERCOT interconnection queue, in Swisher County, Texas.
Queue statusIn planning
- PlanningQueued Mar 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jul 2029 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 29INR0033
- Grid region
- ERCOT (Texas)
- Developer
- IP Blackwell II, LLC
- Connection point (POI)
- Tapping the 345 kV Double-Circuit Line from Tule Canyon (Bus# 23914) to Alibates (Bus# 23900)
- Location
- Swisher County, Texas
- Technology
- Wind: 642 MW
- Total requested
- 642 MW
- Study phase
- SS Completed, FIS Started, No IA
- Queue status
- Active
- Entered queue
- 3 March 2025
- Proposed online date
- July 2029
Location
Marker shows the centre of Swisher County; the queue data does not give exact sites.
Other requests in Swisher County
- Hornet Solar II SLFSolar + storage · 209 MW · agreement signed
- Frye StorageSolar + storage · 504 MW · in study
- Commodus 2 SolarSolar · 502 MW · in study
- Stem SolarSolar · 200 MW · in study
- Solar project GEN-2023-120, Swisher CountySolar · 130 MW · in study
- Hornet SolarSolar · 602 MW · built
- Frye SolarSolar + storage · 502 MW · built
- Comanche Run WindOnshore wind · 500 MW · withdrawn
- Battery storage project GEN-2019-064, Swisher CountyBattery storage · 400 MW · withdrawn
- Wildrose WindOnshore wind · 303 MW · withdrawn
- Lazarus SolarSolar · 300 MW · withdrawn
- Onshore wind project GEN-2015-032, Swisher CountyOnshore wind · 300 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem