United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

ONSHORE WIND Β· SPP

Onshore wind project GEN-2015-032, Swisher County

Onshore wind project GEN-2015-032, Swisher County is a 300 MW onshore wind request withdrawn in the SPP interconnection queue, in Swisher County, Texas, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2015 (completed)
  2. Withdrawn / abandonedOct 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2015-032
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Connection point (POI)
Tulia 115 kV/Newhart 230 kV
Location
Swisher County, Texas
Technology
Wind: 300 MW
Total requested
300 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
29 June 2015
Proposed online date
September 2017
Withdrawn
October 2015

Location

Marker shows the centre of Swisher County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Swisher County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem