BATTERY STORAGE Β· ERCOT

Moore Field BESS

Moore Field BESS is a 9.9 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
24INR0598
Grid region
ERCOT (Texas)
Developer
SBESS TX11 LLC
Connection point (POI)
Transformer - XFMR #2 _x000D_ Station Code - MOORE_FL_x000D_ Load Name - LD2_x000D_ PTI Bus # - 80117_x000D_ Transmission Voltage - 138
Technology
Battery: 9.9 MW
Total requested
9.9 MW
Study phase
No MRD
Queue status
Withdrawn
Entered queue
12 July 2023
Proposed online date
October 2024

Location

No county location in the queue data.

Power plants in Β· Transmission lines in