SOLAR Β· ERCOT

HOVEY (Barilla Solar 1B)

HOVEY (Barilla Solar 1B) is a 7.4 MW solar request withdrawn in the ERCOT interconnection queue, in Pecos County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2010 (completed)
  2. Withdrawn / abandonedDec 2025 (project stopped here)
  3. ConsentedDec 2013 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
12INR0059b
Grid region
ERCOT (Texas)
Developer
First Solar
Connection point (POI)
60385 Solstice 138kV
Location
Pecos County, Texas
Technology
Solar: 7.4 MW
Total requested
7.4 MW
Study phase
MRD Approved
Queue status
Withdrawn
Entered queue
30 November 2010
Agreement signed
26 December 2013
Proposed online date
December 2025
Withdrawn
December 2025

Location

Marker shows the centre of Pecos County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Pecos County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem