United States β€Ί Grid β€Ί Interconnection queues

SOLAR Β· ERCOT

E Babe Smith Solar

E Babe Smith Solar is a 7.6 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2024 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
24INR0719
Grid region
ERCOT (Texas)
Developer
Hwy 183 Solar LLC
Connection point (POI)
Station Name: E BABE SMITH_x000D_ Station Code: EBABES_x000D_ PTI BUS#: 7060_x000D_ Load/Load TR Name: T1_x000D_ kV level: 138 kV
Technology
Solar: 7.6 MW
Total requested
7.6 MW
Study phase
No MRD
Queue status
Withdrawn
Entered queue
12 April 2024
Proposed online date
December 2024

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem