United States › Grid › Interconnection queues › Texas
OTHER · ERCOTCross Trails Gravitational Storage
Cross Trails Gravitational Storage is a 18.0 MW other request withdrawn in the ERCOT interconnection queue, in Scurry County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2022 (completed)
- Withdrawn / abandonedJun 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 22INR0592
- Grid region
- ERCOT (Texas)
- Developer
- Cross Trails Energy Storage Project, LLC
- Connection point (POI)
- 60090 WKN Breaker 69kV
- Location
- Scurry County, Texas
- Technology
- Other: 18.0 MW
- Total requested
- 18.0 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 9 May 2022
- Proposed online date
- January 2025
- Withdrawn
- June 2024
Location
Marker shows the centre of Scurry County; the queue data does not give exact sites.
Other requests in Scurry County
- Canyon WindOnshore wind · 309 MW · agreement signed
- Coyote WindOnshore wind · 243 MW · agreement signed
- Maldives SolarSolar · 184 MW · agreement signed
- Knapp BESSBattery storage · 10.0 MW · agreement signed
- Spectra SolarSolar · 1,200 MW · in study
- Zeus Scurry BESSSolar + storage · 1,043 MW · in study
- Zeus Scurry SolarSolar + storage · 504 MW · in study
- Cedar Draw SolarSolar + storage · 451 MW · in study
- Inadale BESSSolar + storage · 287 MW · in study
- Inadale SolarSolar + storage · 281 MW · in study
- Cedar Draw BESSSolar + storage · 226 MW · in study
- Fluvanna Max Solar SLFSolar + storage · 153 MW · in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem