United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Reiher Solar II

Reiher Solar II is a 18.4 MW solar request withdrawn in the ERCOT interconnection queue, in Upton County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2019 (completed)
  2. Withdrawn / abandonedJul 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
21INR0381
Grid region
ERCOT (Texas)
Developer
EnergieKontor US Texas SP 7 LLC
Connection point (POI)
76597 RobbSw 138kV
Location
Upton County, Texas
Technology
Solar: 18.4 MW
Total requested
18.4 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
24 June 2019
Proposed online date
May 2021
Withdrawn
July 2019

Location

Marker shows the centre of Upton County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Upton County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem