OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in ERCOT (Texas) (2017 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| White Park Solar Solar · 8minutenergy |
600 MW | Withdrawn / abandoned |
| Green Valley Wind Onshore wind · Eon |
500 MW | Withdrawn / abandoned |
| Deepwater Gas · AES |
462 MW | Withdrawn / abandoned |
| Normande Solar Farm Solar · 8minutenergy |
360 MW | Withdrawn / abandoned |
| Hutt Wind Onshore wind · Pioneer Natural Resources |
336 MW | Withdrawn / abandoned |
| Pease River Wind Onshore wind · Eon |
301 MW | Withdrawn / abandoned |
| Bird Dog Wind Onshore wind · Americlean |
300 MW | Withdrawn / abandoned |
| County Line Solar Solar · S Power |
250 MW | Withdrawn / abandoned |
| Buenos Aires 2 W Onshore wind · Terra-Gen |
237 MW | Withdrawn / abandoned |
| La Joya II Wind Onshore wind · Terra-Gen |
237 MW | Withdrawn / abandoned |
| La Joya I Wind Onshore wind · Terra-Gen |
237 MW | Withdrawn / abandoned |
| Oxbow Solar Solar · ENGIE Long Draw Solar 2 LLC |
225 MW | Withdrawn / abandoned |
| Buenos Aires 1 Wind Onshore wind · Terra-Gen |
223 MW | Withdrawn / abandoned |
| Trevino Solar Solar · S Power |
216 MW | Withdrawn / abandoned |
| Shamrock Wind Onshore wind · Eon |
202 MW | Withdrawn / abandoned |
| Shamrock Wind II Onshore wind · Eon |
202 MW | Withdrawn / abandoned |
| Hubbard West Wind Onshore wind · Nextera |
201 MW | Withdrawn / abandoned |
| Red Mud Creek Onshore wind · RWE Renewables Development, LLC |
201 MW | Withdrawn / abandoned |
| March Road Solar Solar · Eon |
200 MW | Withdrawn / abandoned |
| Goodranch Solar Solar · EDF Renewable Energy |
200 MW | Withdrawn / abandoned |
| Watusi Solar Solar · Cypress Creek Renewables |
195 MW | Withdrawn / abandoned |
| Flatland Solar Solar · Sunfinity Renewables |
182 MW | Withdrawn / abandoned |
| Bacon Switch Solar Solar · SunChase Power |
180 MW | Withdrawn / abandoned |
| Buffalo Gap 4 Onshore wind · AES |
175 MW | Withdrawn / abandoned |
| WIT Ranch Wind Onshore wind · Eon |
161 MW | Withdrawn / abandoned |
| Blackwater Draw Solar Solar · Core Solar |
152 MW | Withdrawn / abandoned |
| Crockett Solar Solar · EDP Renewables |
150 MW | Withdrawn / abandoned |
| Tom Green Solar Solar · EDP Renewables |
150 MW | Withdrawn / abandoned |
| Stillwater Solar Solar · Cypress Creek Renewables |
144 MW | Withdrawn / abandoned |
| Old Jackson Solar Solar · OLD JACKSON SOLAR LLC |
129 MW | Withdrawn / abandoned |
| Murphy Lake Solar Solar · S Power |
120 MW | Withdrawn / abandoned |
| Rustler Solar Solar · Cypress Creek Renewables |
113 MW | Withdrawn / abandoned |
| Red Mud Creek II Onshore wind · Eon |
102 MW | Withdrawn / abandoned |
| Loraine Windpark Phase III Onshore wind · Third Planet Wind Power |
100 MW | Withdrawn / abandoned |
| Castro Solar Solar · Oaktree Development |
100 MW | Withdrawn / abandoned |
| Craver Ranch Solar · S Power |
100 MW | Withdrawn / abandoned |
| Solemio Solar · SOLEMIO LLC |
81.4 MW | Withdrawn / abandoned |
| Hill Solar Solar · Sunchase Power |
80.0 MW | Withdrawn / abandoned |
| Millhouse Solar Solar · Cypress Creek Renewables |
75.0 MW | Withdrawn / abandoned |
| Stillwater Storage Other · Cypress Creek Renewables |
72.0 MW | Withdrawn / abandoned |
| Cargil Solar Solar · Cypress Creek Renewables |
65.0 MW | Withdrawn / abandoned |
| Obsidian Solar Solar · Innovative Solar 144 |
60.0 MW | Withdrawn / abandoned |
| Patriot Wind II Onshore wind · NRG |
57.6 MW | Withdrawn / abandoned |
| GSE Three Solar Solar · Alpin Sun |
50.0 MW | Withdrawn / abandoned |
| Able Solar Solar · Sunchase Power |
50.0 MW | Withdrawn / abandoned |
| Live Oak Solar Solar · Infinity Renewables |
50.0 MW | Withdrawn / abandoned |
| Opal Solar Solar · Innovative Solar 165 |
45.0 MW | Withdrawn / abandoned |
| Citrine Solar Solar · Innovative Solar 145 |
45.0 MW | Withdrawn / abandoned |
| Shakes Solar Solar · Cypress Creek Renewables |
42.0 MW | Withdrawn / abandoned |
| Solemio Springs Solar · Alpin Sun |
39.9 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)302 · 46.9 GW
- SPP (Southwest Power Pool)162 · 32.0 GW
- MISO (Midcontinent)127 · 19.9 GW
- PJM (Mid-Atlantic, Midwest)236 · 18.3 GW
- Southeast (non-ISO utilities)208 · 16.9 GW
- CAISO (California)65 · 11.3 GW
- ERCOT (Texas)55 · 8,908 MW
- ISO-NE (New England)42 · 4,856 MW
- NYISO (New York)61 · 2,565 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)