SOLAR Β· ERCOT

Solemio Springs

Solemio Springs is a 39.9 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2017 (completed)
  2. Withdrawn / abandonedSep 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
19INR0124
Grid region
ERCOT (Texas)
Developer
Alpin Sun
Connection point (POI)
tap 138kV 1698 Sulphur Springs Switch - 1814 Sulphur Springs
Technology
Solar: 39.9 MW
Total requested
39.9 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
6 September 2017
Proposed online date
December 2019
Withdrawn
September 2018

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem