United States › Grid › Interconnection queues › Texas
ONSHORE WIND · ERCOTLoraine Windpark Phase III
Loraine Windpark Phase III is a 100 MW onshore wind request withdrawn in the ERCOT interconnection queue, in Mitchell County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2017 (completed)
- Withdrawn / abandonedJul 2023 (project stopped here)
- ConsentedApr 2018 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 18INR0068
- Grid region
- ERCOT (Texas)
- Developer
- Third Planet Wind Power
- Connection point (POI)
- 181153 Lonewolf 345kV
- Location
- Mitchell County, Texas
- Technology
- Wind: 100 MW
- Total requested
- 100 MW
- Study phase
- IA and FIS Pending
- Queue status
- Withdrawn
- Entered queue
- 13 August 2017
- Agreement signed
- 10 April 2018
- Proposed online date
- May 2024
- Withdrawn
- July 2023
Location
Marker shows the centre of Mitchell County; the queue data does not give exact sites.
Other requests in Mitchell County
- Hackberry Creek SolarSolar · 176 MW · agreement signed
- Zeus Mitchell BESS IISolar + storage · 1,043 MW · in study
- Zeus Mitchell BESSSolar + storage · 1,043 MW · in study
- Zeus Spade WindWind + storage · 987 MW · in study
- Zeus Mitchell SolarSolar + storage · 805 MW · in study
- River Boat SolarSolar + storage · 502 MW · in study
- Zeus Spade BESSWind + storage · 446 MW · in study
- Rabbit Hollow Energy StorageBattery storage · 342 MW · in study
- River Boat Power Gas PlantGas · 334 MW · in study
- Prairie Power WindOnshore wind · 303 MW · in study
- River Boat StorageSolar + storage · 207 MW · in study
- Sunflower Valley StorageBattery storage · 206 MW · in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem