United States › Grid › Interconnection queues › Texas
SOLAR · ERCOTHackberry Creek Solar
Hackberry Creek Solar is a 176 MW solar request with a signed interconnection agreement in the ERCOT interconnection queue, in Mitchell County, Texas.
Queue statusConsented
- PlanningQueued Jul 2023 (completed)
- ConsentedDec 2025 (current stage)
- Construction (not yet reached)
- OperatingTarget Jul 2028 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- 25INR0430
- Grid region
- ERCOT (Texas)
- Developer
- Hackberry Creek Solar LLC
- Connection point (POI)
- tap 345kV 10053 Cattleman Switch - 1058 Longshore Switch
- Location
- Mitchell County, Texas
- Technology
- Solar: 176 MW
- Total requested
- 176 MW
- Study phase
- SS Completed, FIS Completed, IA
- Queue status
- Active
- Entered queue
- 31 July 2023
- Agreement signed
- 2 December 2025
- Proposed online date
- July 2028
Location
Marker shows the centre of Mitchell County; the queue data does not give exact sites.
Other requests in Mitchell County
- Zeus Mitchell BESS IISolar + storage · 1,043 MW · in study
- Zeus Mitchell BESSSolar + storage · 1,043 MW · in study
- Zeus Spade WindWind + storage · 987 MW · in study
- Zeus Mitchell SolarSolar + storage · 805 MW · in study
- River Boat SolarSolar + storage · 502 MW · in study
- Zeus Spade BESSWind + storage · 446 MW · in study
- Rabbit Hollow Energy StorageBattery storage · 342 MW · in study
- River Boat Power Gas PlantGas · 334 MW · in study
- Prairie Power WindOnshore wind · 303 MW · in study
- River Boat StorageSolar + storage · 207 MW · in study
- Sunflower Valley StorageBattery storage · 206 MW · in study
- Sepik BESSBattery storage · 205 MW · in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem