United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Old Jackson Solar

Old Jackson Solar is a 129 MW solar request withdrawn in the ERCOT interconnection queue, in Van Zandt County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2017 (completed)
  2. Withdrawn / abandonedNov 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
19INR0123
Grid region
ERCOT (Texas)
Developer
OLD JACKSON SOLAR LLC
Connection point (POI)
tap 138kV 3175 Canton - 3173 Expmtr
Location
Van Zandt County, Texas
Technology
Solar: 129 MW
Total requested
129 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
11 September 2017
Proposed online date
April 2021
Withdrawn
November 2020

Location

Marker shows the centre of Van Zandt County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Van Zandt County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem