ONSHORE WIND Β· ERCOT

Bird Dog Wind

Bird Dog Wind is a 300 MW onshore wind request withdrawn in the ERCOT interconnection queue, in Borden County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2017 (completed)
  2. Withdrawn / abandonedMay 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
19INR0144
Grid region
ERCOT (Texas)
Developer
Americlean
Connection point (POI)
1301 Willow Valley 138kV
Location
Borden County, Texas
Technology
Wind: 300 MW
Total requested
300 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
19 October 2017
Proposed online date
October 2019
Withdrawn
May 2019

Location

Marker shows the centre of Borden County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Borden County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem