Draco Solar

Draco Solar is a 500 MW solar request in interconnection study in the ERCOT interconnection queue, in Borden County, Texas.

Queue statusIn planning
  1. PlanningQueued Apr 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Aug 2027 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
27INR0499
Grid region
ERCOT (Texas)
Developer
Draco Solar LLC
Connection point (POI)
Tap Long Draw (59900) β€šΓ„Γ¬ Faraday (59905) CKT 1 and LONGDRAW (59900) - GALVANI(59912) CKT 2
Location
Borden County, Texas
Technology
Solar: 500 MW
Total requested
500 MW
Study phase
SS Completed, FIS Started, No IA
Queue status
Active
Entered queue
21 April 2025
Proposed online date
August 2027

Location

Marker shows the centre of Borden County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Borden County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem