United States βΊ Grid βΊ Interconnection queues βΊ Texas
ONSHORE WIND Β· ERCOTBuenos Aires 1 Wind
Buenos Aires 1 Wind is a 223 MW onshore wind request withdrawn in the ERCOT interconnection queue, in Hidalgo County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2017 (completed)
- Withdrawn / abandonedSep 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 19INR0048
- Grid region
- ERCOT (Texas)
- Developer
- Terra-Gen
- Connection point (POI)
- tap 345kV 8905 N Edinb - 8455 Lon Hill
- Location
- Hidalgo County, Texas
- Technology
- Wind: 223 MW
- Total requested
- 223 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 29 March 2017
- Proposed online date
- December 2021
- Withdrawn
- September 2020
Location
Marker shows the centre of Hidalgo County; the queue data does not give exact sites.
Other requests in Hidalgo County
- Grapefruit SolarSolar Β· 291 MW Β· agreement signed
- Monte Cristo 1 WindOnshore wind Β· 235 MW Β· agreement signed
- Monte Cristo II WindOnshore wind Β· 234 MW Β· agreement signed
- Gunnar BESSBattery storage Β· 155 MW Β· agreement signed
- Carambola BESSBattery storage Β· 101 MW Β· agreement signed
- North Edinburg BESS 1Battery storage Β· 10.0 MW Β· agreement signed
- SE Edinburg BESSBattery storage Β· 9.9 MW Β· agreement signed
- Palmview BESSBattery storage Β· 9.9 MW Β· agreement signed
- Val Vista Grid BESS 2Battery storage Β· 211 MW Β· in study
- Val Vista Grid BESS 1Battery storage Β· 209 MW Β· in study
- McMEXICO STORAGEBattery storage Β· 202 MW Β· in study
- Fike BESSBattery storage Β· 201 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem