Opal Solar

Opal Solar is a 45.0 MW solar request withdrawn in the ERCOT interconnection queue, in Hardeman County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2017 (completed)
  2. Withdrawn / abandonedOct 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
20INR0016
Grid region
ERCOT (Texas)
Developer
Innovative Solar 165
Connection point (POI)
tap 345kV 60501 Tesla - 60500 Edith Clark
Location
Hardeman County, Texas
Technology
Solar: 45.0 MW
Total requested
45.0 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
10 July 2017
Proposed online date
June 2024
Withdrawn
October 2023

Location

Marker shows the centre of Hardeman County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Hardeman County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem