United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTOpal Solar
Opal Solar is a 45.0 MW solar request withdrawn in the ERCOT interconnection queue, in Hardeman County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2017 (completed)
- Withdrawn / abandonedOct 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 20INR0016
- Grid region
- ERCOT (Texas)
- Developer
- Innovative Solar 165
- Connection point (POI)
- tap 345kV 60501 Tesla - 60500 Edith Clark
- Location
- Hardeman County, Texas
- Technology
- Solar: 45.0 MW
- Total requested
- 45.0 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 10 July 2017
- Proposed online date
- June 2024
- Withdrawn
- October 2023
Location
Marker shows the centre of Hardeman County; the queue data does not give exact sites.
Other requests in Hardeman County
- Tabor SolarSolar Β· 506 MW Β· in study
- Earthwise SolarSolar Β· 371 MW Β· in study
- Lazy U Solar 2Solar Β· 252 MW Β· in study
- Lazy U Solar 1Solar Β· 252 MW Β· in study
- Juniper Ridge BESS 2Battery storage Β· 252 MW Β· in study
- Juniper Ridge BESS 1Battery storage Β· 252 MW Β· in study
- Supra WindOnshore wind Β· 206 MW Β· in study
- Hardeman BESSBattery storage Β· 104 MW Β· in study
- Pease River WindOnshore wind Β· 301 MW Β· withdrawn
- Rattlesnake WindOnshore wind Β· 205 MW Β· withdrawn
- Thunder CreekOnshore wind Β· 200 MW Β· withdrawn
- Solar project GEN-2017-101, Hardeman CountySolar Β· 67.5 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem