United States › Grid › Interconnection queues › Texas
BATTERY STORAGE · ERCOTJuniper Ridge BESS 1
Juniper Ridge BESS 1 is a 252 MW battery storage request in interconnection study in the ERCOT interconnection queue, in Hardeman County, Texas.
Queue statusIn planning
- PlanningQueued Sep 2023 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jun 2029 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 26INR0173
- Grid region
- ERCOT (Texas)
- Developer
- Lazy U ESS 1
- Connection point (POI)
- Tap EDITHCLA7B [60505] -- TESLA7A [60501] 345kV ckt2
- Location
- Hardeman County, Texas
- Technology
- Battery: 252 MW
- Total requested
- 252 MW
- Study phase
- SS Completed, FIS Started, No IA
- Queue status
- Active
- Entered queue
- 8 September 2023
- Proposed online date
- June 2029
Location
Marker shows the centre of Hardeman County; the queue data does not give exact sites.
Other requests in Hardeman County
- Tabor SolarSolar · 506 MW · in study
- Earthwise SolarSolar · 371 MW · in study
- Lazy U Solar 2Solar · 252 MW · in study
- Lazy U Solar 1Solar · 252 MW · in study
- Juniper Ridge BESS 2Battery storage · 252 MW · in study
- Supra WindOnshore wind · 206 MW · in study
- Hardeman BESSBattery storage · 104 MW · in study
- Pease River WindOnshore wind · 301 MW · withdrawn
- Rattlesnake WindOnshore wind · 205 MW · withdrawn
- Thunder CreekOnshore wind · 200 MW · withdrawn
- Solar project GEN-2017-101, Hardeman CountySolar · 67.5 MW · withdrawn
- Opal SolarSolar · 45.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem