United States βΊ Grid βΊ Interconnection queues βΊ Texas
ONSHORE WIND Β· ERCOTThunder Creek
Thunder Creek is a 200 MW onshore wind request withdrawn in the ERCOT interconnection queue, in Hardeman County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2018 (completed)
- Withdrawn / abandonedFeb 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 20INR0156
- Grid region
- ERCOT (Texas)
- Developer
- Nextera
- Connection point (POI)
- 1430 Graham 345kV
- Location
- Hardeman County, Texas
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 16 August 2018
- Proposed online date
- December 2021
- Withdrawn
- February 2019
Location
Marker shows the centre of Hardeman County; the queue data does not give exact sites.
Other requests in Hardeman County
- Tabor SolarSolar Β· 506 MW Β· in study
- Earthwise SolarSolar Β· 371 MW Β· in study
- Lazy U Solar 2Solar Β· 252 MW Β· in study
- Lazy U Solar 1Solar Β· 252 MW Β· in study
- Juniper Ridge BESS 2Battery storage Β· 252 MW Β· in study
- Juniper Ridge BESS 1Battery storage Β· 252 MW Β· in study
- Supra WindOnshore wind Β· 206 MW Β· in study
- Hardeman BESSBattery storage Β· 104 MW Β· in study
- Pease River WindOnshore wind Β· 301 MW Β· withdrawn
- Rattlesnake WindOnshore wind Β· 205 MW Β· withdrawn
- Solar project GEN-2017-101, Hardeman CountySolar Β· 67.5 MW Β· withdrawn
- Opal SolarSolar Β· 45.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem