Shamrock Wind II

Shamrock Wind II is a 202 MW onshore wind request withdrawn in the ERCOT interconnection queue, in Crockett County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2017 (completed)
  2. Withdrawn / abandonedMar 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
19INR0097
Grid region
ERCOT (Texas)
Developer
Eon
Connection point (POI)
76005 Schneeman Draw 345kV
Location
Crockett County, Texas
Technology
Wind: 202 MW
Total requested
202 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
27 July 2017
Proposed online date
December 2021
Withdrawn
March 2020

Location

Marker shows the centre of Crockett County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Crockett County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem