SOLAR Β· ERCOT

Shakes Solar

Shakes Solar is a 42.0 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2017 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
18INR0061
Grid region
ERCOT (Texas)
Developer
Cypress Creek Renewables
Connection point (POI)
tap 138kV 8283 Asherton - 8236 W_Batesvl
Technology
Solar: 42.0 MW
Total requested
42.0 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
22 February 2017
Proposed online date
March 2019

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem