ONSHORE WIND Β· ERCOTGreen Valley Wind
Green Valley Wind is a 500 MW onshore wind request withdrawn in the ERCOT interconnection queue, in Val Verde County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2017 (completed)
- Withdrawn / abandonedDec 2018 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 18INR0057
- Grid region
- ERCOT (Texas)
- Developer
- Eon
- Connection point (POI)
- Tap 138kV 8255 Hamilton - 8680 Rough Canyon
- Location
- Val Verde County, Texas
- Technology
- Wind: 500 MW
- Total requested
- 500 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 15 February 2017
- Proposed online date
- December 2019
- Withdrawn
- December 2018
Location
Marker shows the centre of Val Verde County; the queue data does not give exact sites.
Other requests in Val Verde County
- Tierra Seca BESSBattery storage Β· 103 MW Β· agreement signed
- Zodiac StorageBattery storage Β· 126 MW Β· in study
- Evans Creek Energy StorageBattery storage Β· 103 MW Β· in study
- Visol 1 SolarSolar Β· 94.8 MW Β· in study
- Pumpville Ranch 1Solar Β· 1,000 MW Β· suspended
- Blue Hills WindOnshore wind Β· 276 MW Β· suspended
- Antlia BESSBattery storage Β· 72.4 MW Β· built
- Hamilton BESSOther Β· 10.0 MW Β· built
- Blue Valley SolarSolar Β· 148 MW Β· withdrawn
- Blue Star SolarSolar Β· 72.3 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem