United States βΊ Grid βΊ Interconnection queues βΊ Texas
ONSHORE WIND Β· ERCOTBlue Hills Wind
Blue Hills Wind is a 276 MW onshore wind request suspended in the ERCOT interconnection queue, in Val Verde County, Texas.
Queue statusPaused / redesign
- PlanningQueued May 2019 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jun 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 20INR0271
- Grid region
- ERCOT (Texas)
- Location
- Val Verde County, Texas
- Technology
- Wind: 276 MW
- Total requested
- 276 MW
- Queue status
- Suspended
- Entered queue
- 6 May 2019
- Proposed online date
- June 2026
Location
Marker shows the centre of Val Verde County; the queue data does not give exact sites.
Other requests in Val Verde County
- Tierra Seca BESSBattery storage Β· 103 MW Β· agreement signed
- Zodiac StorageBattery storage Β· 126 MW Β· in study
- Evans Creek Energy StorageBattery storage Β· 103 MW Β· in study
- Visol 1 SolarSolar Β· 94.8 MW Β· in study
- Pumpville Ranch 1Solar Β· 1,000 MW Β· suspended
- Antlia BESSBattery storage Β· 72.4 MW Β· built
- Hamilton BESSOther Β· 10.0 MW Β· built
- Green Valley WindOnshore wind Β· 500 MW Β· withdrawn
- Blue Valley SolarSolar Β· 148 MW Β· withdrawn
- Blue Star SolarSolar Β· 72.3 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem