United States › Grid › Interconnection queues › Texas
BATTERY STORAGE · ERCOTZodiac Storage
Zodiac Storage is a 126 MW battery storage request in interconnection study in the ERCOT interconnection queue, in Val Verde County, Texas.
Queue statusIn planning
- PlanningQueued Nov 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Aug 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 27INR0397
- Grid region
- ERCOT (Texas)
- Developer
- Grenergy USA
- Connection point (POI)
- Tap 138 kV 8680 RGEC Rough Canyon (ROUGHCAN4A) - 8683 Comstock (COMSTOCK4A) Line
- Location
- Val Verde County, Texas
- Technology
- Battery: 126 MW
- Total requested
- 126 MW
- Study phase
- SS Completed, FIS Started, No IA
- Queue status
- Active
- Entered queue
- 19 November 2024
- Proposed online date
- August 2028
Location
Marker shows the centre of Val Verde County; the queue data does not give exact sites.
Other requests in Val Verde County
- Tierra Seca BESSBattery storage · 103 MW · agreement signed
- Evans Creek Energy StorageBattery storage · 103 MW · in study
- Visol 1 SolarSolar · 94.8 MW · in study
- Pumpville Ranch 1Solar · 1,000 MW · suspended
- Blue Hills WindOnshore wind · 276 MW · suspended
- Antlia BESSBattery storage · 72.4 MW · built
- Hamilton BESSOther · 10.0 MW · built
- Green Valley WindOnshore wind · 500 MW · withdrawn
- Blue Valley SolarSolar · 148 MW · withdrawn
- Blue Star SolarSolar · 72.3 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem