United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTBlue Star Solar
Blue Star Solar is a 72.3 MW solar request withdrawn in the ERCOT interconnection queue, in Val Verde County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2021 (completed)
- Withdrawn / abandonedOct 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 24INR0146
- Grid region
- ERCOT (Texas)
- Developer
- GH America Energy, LLC
- Connection point (POI)
- Tap 138 kV 8998 Maxwell - 8261 Whiting Line
- Location
- Val Verde County, Texas
- Technology
- Solar: 72.3 MW
- Total requested
- 72.3 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 3 November 2021
- Proposed online date
- January 2024
- Withdrawn
- October 2022
Location
Marker shows the centre of Val Verde County; the queue data does not give exact sites.
Other requests in Val Verde County
- Tierra Seca BESSBattery storage Β· 103 MW Β· agreement signed
- Zodiac StorageBattery storage Β· 126 MW Β· in study
- Evans Creek Energy StorageBattery storage Β· 103 MW Β· in study
- Visol 1 SolarSolar Β· 94.8 MW Β· in study
- Pumpville Ranch 1Solar Β· 1,000 MW Β· suspended
- Blue Hills WindOnshore wind Β· 276 MW Β· suspended
- Antlia BESSBattery storage Β· 72.4 MW Β· built
- Hamilton BESSOther Β· 10.0 MW Β· built
- Green Valley WindOnshore wind Β· 500 MW Β· withdrawn
- Blue Valley SolarSolar Β· 148 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem