United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTTrevino Solar
Trevino Solar is a 216 MW solar request withdrawn in the ERCOT interconnection queue, in Maverick County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2017 (completed)
- Withdrawn / abandonedSep 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 19INR0070
- Grid region
- ERCOT (Texas)
- Developer
- S Power
- Connection point (POI)
- 78015 Rosita 138kV
- Location
- Maverick County, Texas
- Technology
- Solar: 216 MW
- Total requested
- 216 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 18 April 2017
- Proposed online date
- December 2021
- Withdrawn
- September 2020
Location
Marker shows the centre of Maverick County; the queue data does not give exact sites.
Other requests in Maverick County
- Sugaree SolarSolar Β· 251 MW Β· agreement signed
- Althea StorageBattery storage Β· 251 MW Β· agreement signed
- Escondido BESSBattery storage Β· 10.0 MW Β· agreement signed
- Senator Aggreko SolarSolar + storage Β· 251 MW Β· in study
- Old Victory Energy CenterBattery storage Β· 203 MW Β· in study
- De Los SantosBattery storage Β· 201 MW Β· in study
- Serrano StorageBattery storage Β· 186 MW Β· in study
- Senator Aggreko StorageSolar + storage Β· 153 MW Β· in study
- Fort Duncan BESSOther Β· 106 MW Β· suspended
- BRP Pueblo II BESSOther Β· 10.0 MW Β· built
- BRP Pueblo I BESSOther Β· 10.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem