SOLAR Β· ERCOT

Trevino Solar

Trevino Solar is a 216 MW solar request withdrawn in the ERCOT interconnection queue, in Maverick County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2017 (completed)
  2. Withdrawn / abandonedSep 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
19INR0070
Grid region
ERCOT (Texas)
Developer
S Power
Connection point (POI)
78015 Rosita 138kV
Location
Maverick County, Texas
Technology
Solar: 216 MW
Total requested
216 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
18 April 2017
Proposed online date
December 2021
Withdrawn
September 2020

Location

Marker shows the centre of Maverick County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Maverick County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem