BATTERY STORAGE · ERCOT

De Los Santos

De Los Santos is a 201 MW battery storage request in interconnection study in the ERCOT interconnection queue, in Maverick County, Texas.

Queue statusIn planning
  1. PlanningQueued May 2022 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2027 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
24INR0142
Grid region
ERCOT (Texas)
Developer
BRP De Los Santos BESS LLC
Connection point (POI)
78016 Sunglow Substation 138kV
Location
Maverick County, Texas
Technology
Battery: 201 MW
Total requested
201 MW
Study phase
SS Completed, FIS Started, No IA
Queue status
Active
Entered queue
10 May 2022
Proposed online date
December 2027

Location

Marker shows the centre of Maverick County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Maverick County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem