SOLAR Β· ERCOT

Normande Solar Farm

Normande Solar Farm is a 360 MW solar request withdrawn in the ERCOT interconnection queue, in Borden County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2017 (completed)
  2. Withdrawn / abandonedMar 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
19INR0028
Grid region
ERCOT (Texas)
Developer
8minutenergy
Connection point (POI)
59900 Long Draw 345kV
Location
Borden County, Texas
Technology
Solar: 360 MW
Total requested
360 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
29 January 2017
Proposed online date
June 2021
Withdrawn
March 2020

Location

Marker shows the centre of Borden County; the queue data does not give exact sites.