United States β€Ί Grid β€Ί Interconnection queues

SOLAR Β· ERCOT

Live Oak Solar

Live Oak Solar is a 50.0 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2017 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
19INR0137
Grid region
ERCOT (Texas)
Developer
Infinity Renewables
Connection point (POI)
76003 Big Hill 345kV
Technology
Solar: 50.0 MW
Total requested
50.0 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
2 October 2017
Proposed online date
January 2019

Location

No county location in the queue data.

Power plants in Β· Transmission lines in