Flatland Solar

Flatland Solar is a 182 MW solar request withdrawn in the ERCOT interconnection queue, in Scurry County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2017 (completed)
  2. Withdrawn / abandonedMay 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
19INR0129
Grid region
ERCOT (Texas)
Developer
Sunfinity Renewables
Connection point (POI)
tap 138kV 1032 Morgan - 1064 Sun
Location
Scurry County, Texas
Technology
Solar: 182 MW
Total requested
182 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
19 October 2017
Proposed online date
June 2023
Withdrawn
May 2021

Location

Marker shows the centre of Scurry County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Scurry County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem