United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

ONSHORE WIND Β· ERCOT

La Joya I Wind

La Joya I Wind is a 237 MW onshore wind request withdrawn in the ERCOT interconnection queue, in Hidalgo County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2017 (completed)
  2. Withdrawn / abandonedMar 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
19INR0132
Grid region
ERCOT (Texas)
Developer
Terra-Gen
Connection point (POI)
8574 Pomelo 345kV
Location
Hidalgo County, Texas
Technology
Wind: 237 MW
Total requested
237 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
21 September 2017
Proposed online date
December 2022
Withdrawn
March 2021

Location

Marker shows the centre of Hidalgo County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Hidalgo County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem