SOLAR Β· ERCOT

Watusi Solar

Watusi Solar is a 195 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2017 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
20INR0041
Grid region
ERCOT (Texas)
Developer
Cypress Creek Renewables
Connection point (POI)
tap 69kV 6363 Yellowjacket - 60386 Heartland
Technology
Solar: 195 MW
Total requested
195 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
30 November 2017
Proposed online date
December 2020

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem