πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

OTHER Β· ERCOT

Stillwater Storage

Stillwater Storage is a 72.0 MW other request withdrawn in the ERCOT interconnection queue, in Nueces County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2017 (completed)
  2. Withdrawn / abandonedJun 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
20INR0147
Grid region
ERCOT (Texas)
Developer
Cypress Creek Renewables
Connection point (POI)
tap 345kV 8905 N Edinb - 8455 Lon Hill
Location
Nueces County, Texas
Technology
Other: 72.0 MW
Total requested
72.0 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
12 November 2017
Proposed online date
August 2020
Withdrawn
June 2019

Location

Marker shows the centre of Nueces County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Nueces County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem