United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTSolemio
Solemio is a 81.4 MW solar request withdrawn in the ERCOT interconnection queue, in Hopkins County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2017 (completed)
- Withdrawn / abandonedJan 2022 (project stopped here)
- ConsentedOct 2020 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 19INR0093
- Grid region
- ERCOT (Texas)
- Developer
- SOLEMIO LLC
- Connection point (POI)
- tap 138kV 1698 Sulphur Springs - 1814 Sulspg
- Location
- Hopkins County, Texas
- Technology
- Solar: 81.4 MW
- Total requested
- 81.4 MW
- Study phase
- IA
- Queue status
- Withdrawn
- Entered queue
- 22 June 2017
- Agreement signed
- 22 October 2020
- Proposed online date
- January 2023
- Withdrawn
- January 2022
Location
Marker shows the centre of Hopkins County; the queue data does not give exact sites.
Other requests in Hopkins County
- Pine Forest SolarSolar Β· 302 MW Β· agreement signed
- Pine Forest BESSBattery storage Β· 201 MW Β· agreement signed
- Cartwheel BESS 1Battery storage Β· 154 MW Β· agreement signed
- Claxton SolarSolar Β· 151 MW Β· agreement signed
- Lucky 7 SolarSolar Β· 102 MW Β· agreement signed
- Blarney SolarSolar Β· 81.0 MW Β· agreement signed
- Dairyland StorageBattery storage Β· 302 MW Β· in study
- Palomino SolarSolar + storage Β· 301 MW Β· in study
- Juniperus BESSSolar + storage Β· 170 MW Β· in study
- Cartwheel BESS 2Battery storage Β· 157 MW Β· in study
- Palomino StorageSolar + storage Β· 153 MW Β· in study
- CH Solterra LLCSolar Β· 143 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem